We had to make a modification in the engineering. The solution they came up with is to have to cables running width wise across to provide extra protection from the roofing buckling and falling down. Personally, I feel this is just a step by the city to make a bit of extra cash and a legal failsafe (over-engineering). It was built so strongly that there is no way it would ever cave in. The cables were put in before the trusses were taken down.
Really expensive anchor the engineer came up with that was originally engineered incorrectly...
Next it's time to cut the hole for the bay window.
Uninstall the garage door and frame it.
This is the hole for the french Door.
The floor is built up with pressure treated 2 x 4. It's reinforced, glued, and screwed down.
The ceiling without trusses.
Next the window was built. This itself was a big job. I have confidence that if a tornado picked up the studio and threw it across town, this window would still be intact! It's attached to both the ceiling beams and the structure underneath.
No comments:
Post a Comment